20.09.2018 /

Bözbergtunnel Hydrostatic Formwork ready to start

The Hydrostatic Formwork manufactured for Bözbergtunnel is assembled in jobsite and ready to start with the works.
The machine is also designed  to be modified and adapted to 4 different geometries.