26.02.2019 /
The NBS Albvorlandtunnel formwork has been assembled on site and it's ready to start with the secondary lining works. Kern Tunneltechnik is suppling in total 4 Vault Formworks, 2 Parament Formworks, Reinforcement and Magazine gantries.