INVERT
FORMWORK

Intended for the construction of the tunnel invert previous the vault section. The formwork can be designed to create a specific shape of the tunnel invert according customer requirements. The transport is performed by a double length telescopic traveller.

High up-lift concrete pressure is controlled by a bespoke structure that reacts on the primary lining.
The is provided with platforms to reach all the working areas.